Time and Work Solved Questions

Time and Work questions all rest on one idea: convert everyone’s time into a daily work-rate, combine the rates, then convert back to time. This page covers that core idea, the men-days-work equivalence, alternate-day working and partial-participation variants, and several fully worked examples.

Written by Mahesh Srivastava, Founder of Pariksha Saathi. Published: 2026-10-01. Editorial standards & corrections

Jump to practice questions ↓

The concept, quickly

  • If a person finishes a piece of work in n days, their work rate is 1/n of the work per day. Converting everyone to a rate like this is the key move in almost every question here.
  • When people work together, ADD their individual daily rates to get the combined rate. Time to finish together = 1 ÷ (combined rate).
  • Shortcut for two people, A in x days and B in y days, working together from the start: combined time = xy / (x + y). (This is just the rate-addition rule worked out algebraically — useful to recall directly.)
  • "X% more efficient" means X% more work done per day, i.e., the rate is multiplied by (1 + X/100) — and since rate and time are inverses, the time is divided by the same factor, not multiplied.
  • For the same total work, men and days trade off: Men₁ × Days₁ = Men₂ × Days₂ (add × Hours per day on both sides if daily working hours change too). For a different amount of work W, the general form is (M × D × H) / W = constant.
  • When two people work on alternate days, work out how much gets done in one full cycle (e.g. one day each), see how many whole cycles fit before the work is close to finished, then handle the leftover day by day — do not assume the alternation divides evenly unless it actually does.
  • When someone leaves partway through (or joins partway through), split the problem into stages: find the work done in the stage where everyone present was working together, subtract it from 1, then solve the remaining stage with whoever is left.
  • Check: after working through a multi-stage problem, add up every stage's contribution — it must total exactly 1 (one full job). If it doesn't, a stage was computed incorrectly.

Worked examples

1. A can complete a piece of work in 12 days. What fraction of the work does he complete in 4 days?

Solution

  1. A’s rate = 1/12 of the work per day.
  2. Work done in 4 days = 4 × (1/12) = 4/12
  3. = 1/3

Answer: 1/3 of the work

2. A can complete a work in 10 days and B can complete the same work in 15 days. If they work together, in how many days will they finish it?

Solution

  1. A’s rate = 1/10, B’s rate = 1/15 per day.
  2. Combined rate = 1/10 + 1/15 = 3/30 + 2/30 = 5/30 = 1/6 of the work per day.
  3. Time to finish together = 1 ÷ (1/6) = 6 days.

Answer: 6 days

3. A can do a piece of work in 20 days. B is 25% more efficient than A. Find the number of days B alone takes to complete the same work.

Solution

  1. "25% more efficient" means B’s work rate is 1.25 times A’s rate.
  2. Since time is inversely proportional to rate, B’s time = A’s time ÷ 1.25 = 20 ÷ 1.25
  3. = 16 days

Answer: 16 days

4. A and B together can complete a work in 12 days. A alone can complete it in 20 days. In how many days can B alone complete the work?

Solution

  1. Combined rate (A + B) = 1/12. A’s rate = 1/20.
  2. B’s rate = 1/12 − 1/20 = 5/60 − 3/60 = 2/60 = 1/30 of the work per day.
  3. B’s time alone = 1 ÷ (1/30) = 30 days.

Answer: 30 days

5. 12 men can build a wall in 15 days. How many men, working at the same rate, are needed to build it in 10 days?

Solution

  1. For the same total work, Men × Days stays constant: 12 × 15 = 180.
  2. For 10 days: Men = 180 / 10
  3. = 18 men

Answer: 18 men

6. A can finish a work in 10 days and B in 15 days. They work on alternate days, starting with A. In how many days will the work finish?

Solution

  1. A's rate = 1/10, B's rate = 1/15. In each 2-day cycle (one day A, one day B), work done = 1/10 + 1/15 = 3/30 + 2/30 = 5/30 = 1/6.
  2. After 6 cycles (12 days), work done = 6 × 1/6 = 1 — exactly the whole job, with no leftover day to analyse.
  3. So the work finishes in exactly 12 days.

Answer: 12 days

7. A and B together can complete a work in 12 days. They work together for 4 days, after which A leaves, and B alone completes the remaining work in 16 more days. In how many days could B alone have completed the entire work?

Solution

  1. Combined rate = 1/12. Work done in the first 4 days = 4 × 1/12 = 1/3.
  2. Remaining work = 1 − 1/3 = 2/3, and B alone finishes this in 16 days, so B's rate = (2/3) / 16 = 1/24.
  3. B alone would take 1 ÷ (1/24) = 24 days for the entire work.

Answer: 24 days

Try these yourself

Work through these the same way, then check against the answer.

1. A can complete a work in 8 days. What fraction of the work does he complete in 3 days?

Answer: 3/8 of the work.

2. A can complete a work in 6 days and B can complete the same work in 12 days. Working together, how many days will they take?

Answer: 4 days. Combined rate = 1/6 + 1/12 = 1/4.

3. A and B together can complete a work in 15 days. B alone can complete it in 25 days. In how many days can A alone complete the work?

Answer: 37.5 days. A's rate = 1/15 − 1/25 = 2/75; time = 75/2.

4. 15 men can complete a job in 8 days. How many men, at the same rate, are needed to complete it in 6 days?

Answer: 20 men. Men × Days = 120 (constant); 120/6 = 20.

5. A can finish a work in 8 days and B in 12 days. They work on alternate days, starting with A. In how many days will the work be completed?

Answer: 9.5 days. 4 full cycles (8 days) complete 5/6 of the work; day 9 (A) adds 1/8, leaving 1/24; B finishes that 1/24 in half a day at B's rate of 1/12 per day.

6. A and B can together finish a work in 15 days. They work together for 5 days, then A leaves and B alone finishes the remaining work in 20 more days. Find how long B alone would take for the entire work.

Answer: 30 days. Work done together in 5 days = 1/3; remaining 2/3 takes B 20 days, so B's rate = 1/30.

7. A can do a work in 18 days and B in 24 days. They work together for 8 days. What fraction of the work remains?

Answer: 2/9. Combined rate = 1/18 + 1/24 = 7/72; work done in 8 days = 56/72 = 7/9; remaining = 2/9.

All 14 practice questions on Time and Work, with answers →

Where this comes up

Time and Work is named in the mathematics, numerical or quantitative syllabus of SSC MTS, SSC GD Constable, RRB NTPC, RRB Group D, RRB ALP, UP Police Constable and Haryana CET among the exams Pariksha Saathi covers (for any other exam, check your own exam’s official notification) — and the same rate-based thinking carries over into Pipes and Cisterns questions.

Keep practising

Solve the questions above before opening the answers. Explain each step in your own words, then revisit any mistakes.

Start this topic’s quiz →

Explore the lesson library