Cabinet Approves Green Energy Corridor Phase-III Scheme for Intra-State Transmission with Battery Storage
The Union Cabinet has cleared the third phase of the Green Energy Corridor (GEC-III), which will strengthen transmission networks within States and Union Territories so that up to 135 GW of renewable power can be evacuated. It also provides for 50 GWh of battery energy storage at generation sites or other key grid points, to manage intermittency, congestion and demand in non-solar hours. Of the ₹1,86,405 crore outlay, ₹1,36,378 crore is for intra-state transmission and ₹50,000 crore for batteries, with central financial support of ₹54,082 crore meant to offset intra-state transmission charges and keep power costs down. State Transmission Utilities will implement the scheme, which is due for completion by FY 2032-33 and supports India's target of 900 GW of installed non-fossil capacity by 2035.
Drafted with AI assistance from the official PIB release linked above and checked against it by a second AI pass. Not line-edited by a human. Published by Mahesh Srivastava, who corrects any error you report.
Learning context
The Green Energy Corridor idea came from a 2012 POWERGRID study which found transmission near solar and wind sites inadequate. States prepared transmission plans that were appraised by the Central Electricity Authority, and MNRE’s intra-state GEC Phase-I (work from 2015) and Phase-II followed. Under the Electricity Act, 2003, a State Transmission Utility (Section 39) handles transmission within a state, while the Central Transmission Utility (Section 38) handles the inter-state network.
Reference: MNRE’s Green Energy Corridor overview
Check yourself: is GEC-III mainly an inter-state transmission scheme run by the Central Transmission Utility?
No. GEC-III strengthens intra-state transmission, and State Transmission Utilities are its implementing agencies; central support offsets intra-state transmission charges.
Revision task: split the ₹1,86,405 crore outlay into its two components and note separately how much is central financial support.
Test yourself
The Green Energy Corridor Phase-III (GEC-III) scheme approved by the Cabinet provides for how much battery energy storage?
Show the answer
Answer: 50 GWh
GEC-III provides 50 GWh of battery storage and strengthens intra-State transmission so up to 135 GW of renewable power can be evacuated; the outlay is ₹1,86,405 crore, with completion due by FY 2032-33.
Read the daily collection → · Editorial standards & corrections